Revert #1091 "Update link outdate" - #1109
Conversation
This reverts commit 533d176.
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info⚙️ Run configurationConfiguration used: defaults Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (1)
Included review availability: Your plan provides up to 3 included reviews per hour; 0 remain after this review. 📝 WalkthroughWalkthroughThe tutorial now links to ChangesTutorial link update
Estimated code review effort: 1 (Trivial) | ~2 minutes Merge Risk: ⚪ Minimal · up to This localized documentation-only revert restores the intended tutorial link behavior and introduces no actionable merge-blocking risk beyond normal checks. Possibly related PRs
Suggested reviewers: 🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✨ Finishing Touches🧪 Generate unit tests (beta)
Comment |
…veit#1109) This reverts commit 533d176.
…veit#1109) This reverts commit 533d176.
…veit#1109) This reverts commit 533d176.
Reverts #1091 for the following reasons. In a nutshell I noticed I might have merged that PR prematurely:
doc/tutorialswhile only panda is indoc/examples.doc/tutorialswhere kinova should be preferred over panda as mentioned above.humblebranch. So an issue still remains onhumblebranch. That's a separate problem.Summary by CodeRabbit