Milestones
List view
Qualified runtime simplification and 1.0 engineering preparation: matched fused/unfused performance (#1398), default transition (#1399), K-Fusion removal (#1400), final evidence/docs (#1401/#1375), controlled benchmark refresh (#1361), and optional registry canonicalization (#1779). Implement ABI burn-in monitoring (#1810) and signed SBOM/ABI release publication (#1811). Real branch cut, 30-day burn-in, 24h soak and maintainer/GA signoff remain in their 1.0 milestones. No evidence waivers; ready work may land earlier. No fixed due date.
No due date•0/2 issues closedBounded execution and qualification after 0.80 foundations: resumable JOIN/pipelines (#1370/#1777/#1382), spill (#1372), lossless shared-budget exchange (#1373), TDD progress/reclamation (#1383), full unfused DOOP W1/W8 under <=16 GiB (#1385), required six-workload correctness (#1386), and final integrated evidence/docs (#1387). Parents #1367/#1376 close only on full acceptance. No budget-error/SKIP substitute for completion. Preserve existing perf/RSS policy. Milestones are completion targets, not landing barriers; no fixed due date.
No due date•2/22 issues closedDeveloper-infrastructure track, numbered independently of the release milestones and gating no release. Scope: CI pipeline cost and throughput. Queue delay and critical-path duration, compiler-cache health, duplicate compilation across test targets, the job dependency graph under measured runner capacity, and how early a failing contract surfaces in a job. Boundary: gate correctness stays with the release milestone that owns the contract. A gate that does not enforce its documented contract, an inventory that has drifted from source, or a ratchet sharp edge is release work even when it lives in scripts/ci. Only work whose payoff is measured in developer feedback time belongs here. Sequencing: measurement lands before the changes it justifies. No due date.
No due date•3/16 issues closedPost-0.70 foundations: repair live ownership/reservation leaks and publication atomicity; finish pin/lifetime and allocation-admission contracts (#1812, succeeding #1384, and #1369), owner-TDD transactions, trustworthy release gates and certificate authority (#1318). Reconcile already-landed mechanisms before reimplementation. Safe finite resource rejection may satisfy foundation issues but does not prove full bounded DOOP. Delivered perf/RSS gate work (#1359) and unsupported-0.30 removal (#1360) remain delivered. Full bounded completion targets 0.85.0; K-Fusion retirement targets 0.90.0. Existing acceptance remains binding; ready fixes may land earlier. No fixed due date. Includes independent current-path scratch/arrangement improvements (#1481/#1467) and benchmark correctness/recalibration (#1526/#1361); these do not wait for retirement.
No due date•66/80 issues closedStable 1.0 release. Signed tag + tarball + SBOM + ABI manifest, CHANGELOG [1.0.0] merged, README supported-versions updated.
Due by December 1, 2026•22/28 issues closedActual candidate validation: 24h fuzz soak, all Tier-1 platforms green, unchanged passing conformance, existing five-persona signoff, and required ABI/perf-RSS burn-in evidence (#789/#695). #686 is the canonical checklist. External 0.30 migration validation is retired. Monitor implementation is #1810; fixture runs do not satisfy real observation windows.
No due date•6/10 issues closedActual 1.0 branch cut and verified protection (#746/#1151), frozen ABI and blocking quality gates, plus PSIRT/CVE operational readiness (#1144). #685 is the canonical checklist. Mandatory NDA beta distribution and external 0.30 migration validation were retired, not satisfied by substitute quotas. Preparatory engineering may land before cutover.
No due date•18/22 issues closed