Skip to content

chore: update pr trans sync workflow#22576

Merged
qiancai merged 6 commits intopingcap:masterfrom
qiancai:update-pr-trans-sync-workflow
Apr 13, 2026
Merged

chore: update pr trans sync workflow#22576
qiancai merged 6 commits intopingcap:masterfrom
qiancai:update-pr-trans-sync-workflow

Conversation

@qiancai
Copy link
Copy Markdown
Collaborator

@qiancai qiancai commented Mar 18, 2026

First-time contributors' checklist

What is changed, added or deleted? (Required)

Which TiDB version(s) do your changes apply to? (Required)

Tips for choosing the affected version(s):

By default, CHOOSE MASTER ONLY so your changes will be applied to the next TiDB major or minor releases. If your PR involves a product feature behavior change or a compatibility change, CHOOSE THE AFFECTED RELEASE BRANCH(ES) AND MASTER.

For details, see tips for choosing the affected versions.

  • master (the latest development version)
  • v9.0 (TiDB 9.0 versions)
  • v8.5 (TiDB 8.5 versions)
  • v8.1 (TiDB 8.1 versions)
  • v7.5 (TiDB 7.5 versions)
  • v7.1 (TiDB 7.1 versions)
  • v6.5 (TiDB 6.5 versions)
  • v6.1 (TiDB 6.1 versions)
  • v5.4 (TiDB 5.4 versions)

What is the related PR or file link(s)?

  • This PR is translated from:
  • Other reference link(s):

Do your changes match any of the following descriptions?

  • Delete files
  • Change aliases
  • Need modification after applied to another branch
  • Might cause conflicts after applied to another branch

@gemini-code-assist
Copy link
Copy Markdown
Contributor

Note

Gemini is unable to generate a summary for this pull request due to the file types involved not being currently supported.

@ti-chi-bot ti-chi-bot bot added missing-translation-status This PR does not have translation status info. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. labels Mar 18, 2026
@qiancai qiancai force-pushed the update-pr-trans-sync-workflow branch from 5f35025 to 495385a Compare March 18, 2026 07:38
@qiancai qiancai self-assigned this Mar 26, 2026
@ti-chi-bot ti-chi-bot bot added size/L Denotes a PR that changes 100-499 lines, ignoring generated files. and removed size/M Denotes a PR that changes 30-99 lines, ignoring generated files. labels Apr 11, 2026
@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot bot commented Apr 13, 2026

[LGTM Timeline notifier]

Timeline:

  • 2026-04-13 02:54:49.518422812 +0000 UTC m=+1356894.723782859: ☑️ agreed by Oreoxmt.

@ti-chi-bot ti-chi-bot bot added the needs-1-more-lgtm Indicates a PR needs 1 more LGTM. label Apr 13, 2026
@qiancai
Copy link
Copy Markdown
Collaborator Author

qiancai commented Apr 13, 2026

/approve

@qiancai qiancai added the lgtm label Apr 13, 2026
@ti-chi-bot
Copy link
Copy Markdown

ti-chi-bot bot commented Apr 13, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: qiancai

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added the approved label Apr 13, 2026
@qiancai qiancai added the translation/no-need No need to translate this PR. label Apr 13, 2026
@ti-chi-bot ti-chi-bot bot removed the missing-translation-status This PR does not have translation status info. label Apr 13, 2026
@qiancai
Copy link
Copy Markdown
Collaborator Author

qiancai commented Apr 13, 2026

/retest

@qiancai qiancai merged commit 0813b50 into pingcap:master Apr 13, 2026
11 of 13 checks passed
@qiancai qiancai deleted the update-pr-trans-sync-workflow branch April 13, 2026 03:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. translation/no-need No need to translate this PR.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants