diff --git a/.github/workflows/build-pdfs.yml b/.github/workflows/build-pdfs.yml index 9e6f81f..5033608 100644 --- a/.github/workflows/build-pdfs.yml +++ b/.github/workflows/build-pdfs.yml @@ -2,8 +2,6 @@ name: Build PDFs on: push: - branches: [main] - tags: ["v*"] workflow_dispatch: jobs: @@ -13,7 +11,7 @@ jobs: image: pandoc/extra:latest-ubuntu steps: - - uses: actions/checkout@v4 + - uses: actions/checkout@v6 with: fetch-depth: 1 sparse-checkout: | @@ -56,8 +54,11 @@ jobs: -o "dist/${name}.pdf" done + - name: Copy documents PDFs to dist + run: cp documents/*.pdf dist/ + - name: Upload PDFs as artifacts - uses: actions/upload-artifact@v4 + uses: actions/upload-artifact@v7 with: name: tutorial-pdfs path: dist/*.pdf @@ -65,6 +66,6 @@ jobs: - name: Publish to GitHub Release if: startsWith(github.ref, 'refs/tags/') - uses: softprops/action-gh-release@v2 + uses: softprops/action-gh-release@v3 with: files: dist/*.pdf diff --git a/documents/src/well_planning/RI_well_planning.md b/documents/src/well_planning/RI_well_planning.md index 380987d..2480080 100644 --- a/documents/src/well_planning/RI_well_planning.md +++ b/documents/src/well_planning/RI_well_planning.md @@ -47,7 +47,7 @@ To execute a simulation and automatically load results in ResInsight: ### Schedule File Variants -The INCLUDE statement in `NORNE_ATW2013.DATA` references `BC0407_HIST01122006.SCH`. Three versions are available — swap the filename in the INCLUDE to change simulation speed vs. detail: +The `INCLUDE` statement in `NORNE_ATW2013.DATA` references `BC0407_HIST01122006.SCH`. Three versions are available — swap the filename in the `INCLUDE` to change simulation speed vs. detail: | File | Timesteps | Period | Use case | |---|---:|---|---| @@ -70,7 +70,7 @@ Contour maps visualize property distributions in the reservoir. They can be used **To create a contour map:** -1. In the Project Tree, right-click the 3D view and select **New Contour Map from 3D View** +1. In the **Project Tree**, right-click the 3D view and select **New Contour Map from 3D View** 2. Select the last time step to analyze final conditions 3. Configure the map: - Set **Map Projection** as needed @@ -129,3 +129,15 @@ To define a new well path and configure production constraints: | Max Surface Liquid Production Rate | 5000 | | Max Bottom Hole Pressure | 50 | + +## Review Well Performance + +1. Create plots for WOPR, WGOR and WWCT for all wells + +## Add Refinement + +1. Add a Refinement Region from the right-click menu of a 3D view +1. Move the refinement region to cover the perforation interval of the introduced well path. +1. Export sector model to a new folder, and make sure the new well is part of the simulation. +1. Run the simulation and compare with no refinement. +