2026-07-23 Engineering Team #122

Description

@joecastiglione

Agenda

  • Open Pull Request Follow-ups
    • Jeff review / check-in next week's Engineering meeting
  • ActivitySim Application & Analysis Guide (CS)
    • Status
      • Telecommuting change
      • Network change
  • Explicit Telecommute Implementation (WSP)
  • EET Implementation and Improvement (Outer Loop)
    • Status: complete?
      • PR?
      • Documentation updates?
  • EET Investigation of Inconsistencies (Outer Loop)
    • Status: complete?
    • Presentation vs Technical Report
  • Model Calibration – Partial Automation (RSG)
    • PSRC + Transport for NSW testing status
    • FineTune vs. ActivitySim comparison table
  • EET Updated Random Number Generation (RSG)
    • Status: complete?
  • EET Output Analysis (RSG)
    • Status: complete?
  • Telecommute Frequency Model Update and Tests
    • Presentation?
    • MWCOG testing coordination

Notes

Meeting Purpose

  • Joe explained he's substituting for Jeff, who can't make the later meeting times for the next few months.
  • Format shifted to a project-management review of Phase 11C task status, aiming to close out remaining work before pivoting to Phase 12 planning in September.

Task-by-Task Status

ActivitySim Application and Analysis Guide (CS)

  • Joe Flood has largely finished responding to comments on the land use change and still needs to add analysis metrics.
  • Has not yet shared the telecommute and network change write-ups.
  • Action: Joe Flood to continue land use analysis metrics; next check-in scheduled for Aug 25.

Explicit Telecommute Model (WSP)

  • Completed review of ~200 worker-day records with conflicting telework/away-from-home hours.
  • Ran full-scale SANDAG model with newly estimated telecommute models; results look reasonable, with one model showing better fit than the other (hypotheses being explored).
  • Incorporating industry/occupation data into finalization.
  • Action: Final presentation targeted for Aug 11.
  • Lower priority: investigate telecommute-frequency/MGRA "same zone" data anomaly flagged by David and Joel — Sijia will address only if time remains after primary tasks.

Telecommute Frequency Model (RSG)

  • Parallel TransLink-funded work produced a much larger, correctly-signed mode-choice logsum coefficient than the SANDAG estimation, raising questions about regional/temporal/survey differences.
  • Discussed options: share TransLink's specification with MWCOG for comparison testing, or have MWCOG apply the logsum coefficient to existing models.
  • Action: David/Joel to send an email/short comparison summary of SANDAG vs. TransLink specifications and recommendations within 2–3 weeks (~week of Aug 11).
  • Action: Coordinate with MWCOG to run sensitivity test on current spec; targeting **September * (~5 weeks out) for a consortium check-in including MWCOG's test results.
  • David/Joel will also prepare documentation/presentation summarizing the telecommute-frequency investigation walkthrough (follow-up to yesterday's meeting).

EET (Explicit Error Term) Work (Outer Loop)

  • Pull request reviewed by David last week; only minor changes remain for Jan to incorporate.
  • Documentation reviewed by David — thorough, no major comments.
  • Considered essentially complete; some inconsistency-investigation findings and a Monte Carlo vs. explicit-error-term MAZ sampling prototype will be opened as a separate issue (PR?) for future consideration, not funded further now.
  • Action: Jan to incorporate minor PR changes and submit invoice once complete.
  • Action: David to run one additional test (full scenario without shadow pricing) to confirm small numerical changes hold; tentatively scheduled for Aug 4, budget-permitting.
  • Poisson sampling method: confirmed tested successfully, folded into EET deliverable; Jan noted priority sampling explored as an alternative with similar noise properties — flagged as a topic for future discussion, not immediate action.

Model Calibration / Partial Automation (RSG)

  • Joe C asked about PSRC and TfNSW possibly testing new RSG calibration tool
  • Amir: TfNSW is mid-calibration for their ABM release (due in about a week) and prioritizing their internal FineTune tool over RSG's log-ratio method, due to its support for more optimizers and better visualization/dashboards.
  • TfNSW not expected to test the RSG (log-ratio) method given their current focus.
  • Discussion on open-sourcing FineTune: Amir noted TfNSW leadership (Shaun) is pursuing this internally with legal, but no timeline yet.
  • Amir proposed distinguishing two products: (1) RSG's embedded market-share calibration (fast, good for policy/scenario testing) vs. (2) a more comprehensive optimizer library needed for complex calibrations with competing targets (e.g., tour mode choice, distance model soft-capping).
  • David pushed back that the log-ratio method has successfully calibrated all consortium models to date, including tour mode choice.
  • Action: No immediate task; to be revisited as part of Phase 12 prioritization — a joint Product/Community and Engineering discussion on the future vision for calibration tooling.

Random Number Generation Task

  • Considered closed/complete at investigation and implementation level, even though results didn't yield an integrated change.
  • Action: David to open a documentation branch/issue (similar to EET's prior approach) capturing findings and code for potential future pickup; no further check-ins needed on calendar.

Coordination Discussion

  • Joe raised concern about redundant/parallel work streams (e.g., consortium-funded calibration work vs. TfNSW FineTune tool development; consortium / MWCOG telecommute estimation work vs. TransLink-funded telecommute estimation work) and asked whether better coordination is needed.
  • General agreement that coordination is difficult due to differing agency timelines, but should be pursued where possible; some past examples (e.g., park-and-ride feature) worked out well without a priori coordination.

Broader Discussion: Investigation Rigor & Testing

  • Joe raised a general question about how much effort/money to invest in chasing down unexplained anomalies (e.g., shadow pricing discrepancies in SANDAG's model, ongoing memory-release issue).
  • David suggested many such issues could be addressed via consortium support funds.
  • Sijia raised whether the consortium should more actively "own" validation of the SANDAG example model, since it currently relies on SANDAG staff to catch bugs.
  • Joe expressed that he thought it would be impractical for the consortium to fully own model validation (resource constraints, no dedicated survey/count data, no local knowledge), but agreed the consortium should be more rigorous in verifying that funded work is properly validated (cited a specific gap: he and Bhargav review found no clear validation of shadow-pricing convergence beyond "zones not reopening").
  • David suggested this rigor/support-fund model could be a value proposition to attract new agencies to join the consortium.

Summary of Key Dates

Date Item
Aug 4 (tentative) David: re-run EET test without shadow pricing
Aug 11 Sijia: final explicit telecommute presentation
~Aug 11-14 David/Joel: SANDAG vs. TransLink telecommute-frequency spec summary/email
Aug 25 Joe Flood: Application & Analysis Guide check-in
Sept 1 Telecommute frequency: consortium check-in w/ MWCOG test results
Ongoing/Phase 12 Calibration tooling vision (fine-tune vs. RSG) discussion

Metadata

Metadata

Assignees

No one assigned

    Labels

    meetingMeeting notes.

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions