Agenda
- Open Pull Request Follow-ups
- Jeff review / check-in next week's Engineering meeting
- ActivitySim Application & Analysis Guide (CS)
- Status
- Telecommuting change
- Network change
- Explicit Telecommute Implementation (WSP)
- EET Implementation and Improvement (Outer Loop)
- Status: complete?
- PR?
- Documentation updates?
- EET Investigation of Inconsistencies (Outer Loop)
- Status: complete?
- Presentation vs Technical Report
- Model Calibration – Partial Automation (RSG)
- PSRC + Transport for NSW testing status
- FineTune vs. ActivitySim comparison table
- EET Updated Random Number Generation (RSG)
- EET Output Analysis (RSG)
- Telecommute Frequency Model Update and Tests
- Presentation?
- MWCOG testing coordination
Notes
Meeting Purpose
- Joe explained he's substituting for Jeff, who can't make the later meeting times for the next few months.
- Format shifted to a project-management review of Phase 11C task status, aiming to close out remaining work before pivoting to Phase 12 planning in September.
Task-by-Task Status
ActivitySim Application and Analysis Guide (CS)
- Joe Flood has largely finished responding to comments on the land use change and still needs to add analysis metrics.
- Has not yet shared the telecommute and network change write-ups.
- Action: Joe Flood to continue land use analysis metrics; next check-in scheduled for Aug 25.
Explicit Telecommute Model (WSP)
- Completed review of ~200 worker-day records with conflicting telework/away-from-home hours.
- Ran full-scale SANDAG model with newly estimated telecommute models; results look reasonable, with one model showing better fit than the other (hypotheses being explored).
- Incorporating industry/occupation data into finalization.
- Action: Final presentation targeted for Aug 11.
- Lower priority: investigate telecommute-frequency/MGRA "same zone" data anomaly flagged by David and Joel — Sijia will address only if time remains after primary tasks.
Telecommute Frequency Model (RSG)
- Parallel TransLink-funded work produced a much larger, correctly-signed mode-choice logsum coefficient than the SANDAG estimation, raising questions about regional/temporal/survey differences.
- Discussed options: share TransLink's specification with MWCOG for comparison testing, or have MWCOG apply the logsum coefficient to existing models.
- Action: David/Joel to send an email/short comparison summary of SANDAG vs. TransLink specifications and recommendations within 2–3 weeks (~week of Aug 11).
- Action: Coordinate with MWCOG to run sensitivity test on current spec; targeting **September * (~5 weeks out) for a consortium check-in including MWCOG's test results.
- David/Joel will also prepare documentation/presentation summarizing the telecommute-frequency investigation walkthrough (follow-up to yesterday's meeting).
EET (Explicit Error Term) Work (Outer Loop)
- Pull request reviewed by David last week; only minor changes remain for Jan to incorporate.
- Documentation reviewed by David — thorough, no major comments.
- Considered essentially complete; some inconsistency-investigation findings and a Monte Carlo vs. explicit-error-term MAZ sampling prototype will be opened as a separate issue (PR?) for future consideration, not funded further now.
- Action: Jan to incorporate minor PR changes and submit invoice once complete.
- Action: David to run one additional test (full scenario without shadow pricing) to confirm small numerical changes hold; tentatively scheduled for Aug 4, budget-permitting.
- Poisson sampling method: confirmed tested successfully, folded into EET deliverable; Jan noted priority sampling explored as an alternative with similar noise properties — flagged as a topic for future discussion, not immediate action.
Model Calibration / Partial Automation (RSG)
- Joe C asked about PSRC and TfNSW possibly testing new RSG calibration tool
- Amir: TfNSW is mid-calibration for their ABM release (due in about a week) and prioritizing their internal FineTune tool over RSG's log-ratio method, due to its support for more optimizers and better visualization/dashboards.
- TfNSW not expected to test the RSG (log-ratio) method given their current focus.
- Discussion on open-sourcing FineTune: Amir noted TfNSW leadership (Shaun) is pursuing this internally with legal, but no timeline yet.
- Amir proposed distinguishing two products: (1) RSG's embedded market-share calibration (fast, good for policy/scenario testing) vs. (2) a more comprehensive optimizer library needed for complex calibrations with competing targets (e.g., tour mode choice, distance model soft-capping).
- David pushed back that the log-ratio method has successfully calibrated all consortium models to date, including tour mode choice.
- Action: No immediate task; to be revisited as part of Phase 12 prioritization — a joint Product/Community and Engineering discussion on the future vision for calibration tooling.
Random Number Generation Task
- Considered closed/complete at investigation and implementation level, even though results didn't yield an integrated change.
- Action: David to open a documentation branch/issue (similar to EET's prior approach) capturing findings and code for potential future pickup; no further check-ins needed on calendar.
Coordination Discussion
- Joe raised concern about redundant/parallel work streams (e.g., consortium-funded calibration work vs. TfNSW FineTune tool development; consortium / MWCOG telecommute estimation work vs. TransLink-funded telecommute estimation work) and asked whether better coordination is needed.
- General agreement that coordination is difficult due to differing agency timelines, but should be pursued where possible; some past examples (e.g., park-and-ride feature) worked out well without a priori coordination.
Broader Discussion: Investigation Rigor & Testing
- Joe raised a general question about how much effort/money to invest in chasing down unexplained anomalies (e.g., shadow pricing discrepancies in SANDAG's model, ongoing memory-release issue).
- David suggested many such issues could be addressed via consortium support funds.
- Sijia raised whether the consortium should more actively "own" validation of the SANDAG example model, since it currently relies on SANDAG staff to catch bugs.
- Joe expressed that he thought it would be impractical for the consortium to fully own model validation (resource constraints, no dedicated survey/count data, no local knowledge), but agreed the consortium should be more rigorous in verifying that funded work is properly validated (cited a specific gap: he and Bhargav review found no clear validation of shadow-pricing convergence beyond "zones not reopening").
- David suggested this rigor/support-fund model could be a value proposition to attract new agencies to join the consortium.
Summary of Key Dates
| Date |
Item |
| Aug 4 (tentative) |
David: re-run EET test without shadow pricing |
| Aug 11 |
Sijia: final explicit telecommute presentation |
| ~Aug 11-14 |
David/Joel: SANDAG vs. TransLink telecommute-frequency spec summary/email |
| Aug 25 |
Joe Flood: Application & Analysis Guide check-in |
| Sept 1 |
Telecommute frequency: consortium check-in w/ MWCOG test results |
| Ongoing/Phase 12 |
Calibration tooling vision (fine-tune vs. RSG) discussion |
Agenda
Notes
Meeting Purpose
Task-by-Task Status
ActivitySim Application and Analysis Guide (CS)
Explicit Telecommute Model (WSP)
Telecommute Frequency Model (RSG)
EET (Explicit Error Term) Work (Outer Loop)
Model Calibration / Partial Automation (RSG)
Random Number Generation Task
Coordination Discussion
Broader Discussion: Investigation Rigor & Testing
Summary of Key Dates